MLW General Contractor contracted to add a 4th story addition to this Lake Washington residence.

This addition shows an extensive knowledge of framing to finish. In addition to the complicated framing, starting with carrying the structural loads down 3 floors to the foundation, there were also the
 
  complications of access; solved by a spiral stair case; and the additional heating/cooling system and resulting duct work in the floor framing.

The roof lines and the interior finish work that followed those roof lines was a fun challenge.
 
   