|
MLW General Contractor contracted to add a 4th story addition to this
Lake Washington residence.
This addition
shows an extensive knowledge of framing to finish. In addition to the
complicated framing, starting with carrying the structural loads down 3 floors
to the foundation, there were also the |
|
|
|
complications of access; solved by a spiral stair case;
and the additional heating/cooling system and resulting duct work in the floor
framing.
The roof lines and the interior finish work that followed those roof
lines was a fun challenge. |
|
|